May 20th 2006
Project:
Upgrade all floor switching equipment and install wireless on Floors
1 & 6 as well as 1 AP per floor during the annual data center
shutdown (Which is generally for Fire, UPS, Generator, Cooling Maintenance) all
while 2 new 10 Ton A/C units are being added to the DC to make the total cooling
capacity 100 tons and a crane lifts the heat exchangers to the roof.
|
What we installed... |